top of page

Reference

Selection of reference:

  • D149 – Nuclear powerplant pipeline for heat transport

  • Connection of the hot water system of boiler room K7 and installation of cogeneration unit

  • Installation of a cogeneration unit in the boiler room of Seifertova elementary school

  • St. Anne´s University Hospital Brno – transition from steam to hot water

  • 4d Centrum Kodaňská: gas boiler room

  • Installation of Mutěnice cogeneration units

  • Energocentrum – design of the heat source of the FOODISH (steam, heating water)

  • Increasing the efficiency of the TG cooling circuit - installation of a heat pump

  • ZDS FM Replacement of pipes HKV PB4 – PB7

  • Reconstruction of the steam pipe to the hot pipe system in Přerov town

  • VVTL gas pipeline DN 1000 in Starovice

  • VVTL compressor station Veselí n. L. – pipelines

© 2021 ENERGO team

Durďákova 346/38, Černá Pole, 613 00 Brno                     +420 724 404 474

bottom of page